|

East
Parking Lot Sub-Base |

West
Parking Lot Limerock Base |
|

Floor Box
and Conduit Rough-In at East Slab |

East
Concrete Slab Poured |
|

Balcony
Rebar and Electrical / Plumbing Drain Rough-In |

Balcony
Concrete Slab Poured |
|

West 6”
Concrete Slab on Grade Poured |

Concession
Building Underground Rough-In |
|

Existing
Building Underground Electrical Rough-In |

Existing
Building Underground Plumbing Rough-In |